FEMA’s remapping program has required local agencies to collect technical data to continue levee certification. FEMA underestimated the time it would take for state and local agencies to gather the information needed to recertify levees. As a result, FEMA modified their process to provide an additional 24 months to gather the needed documentation to demonstrate compliance with current federal standards through a Provisionally Accredited Levee (PAL) agreement.
Local agencies have signed and submitted PAL agreements to FEMA for the levee sections identified on FEMA’s Levee Status Map. FEMA designates a levee as a PAL when there is sufficient evidence to conditionally show that a levee will provide a 100-year level of flood protection.
SJAFCA prepared and submitted PAL compliance documentation in the form of Letters of Map Revision (LOMR) to satisfy FEMA's levee accreditation. Below is the list of levees for which LOMRs were submitted to FEMA:
-
Levees east of Shima Tract (P375, P378 and P379)
-
submitted to FEMA April 28, 2009
-
accredited by FEMA December 30, 2009
-
-
Fourteen Mile Slough Levee, north bank, east of I-5 (P124)
-
submitted to FEMA August 20, 2009
-
accredited by FEMA June 2, 2010
-
-
Lower Calaveras River (P454, P356, P357, P140, P1401)
-
submitted to FEMA March 26, 2010
-
accredited by FEMA January 21, 2011
-
included in the LOMR are reports for certification of P359 within the jurisdiction of Reclamation District 1614.
-
P359 accredited by FEMA January 21, 2011
-
-
Walker Slough
-
submitted to FEMA March 26, 2010
-
accredited by FEMA January 21, 2011
-
SJAFCA also completed an Interior Drainage Study Report for use by Reclamation District 404 in their PAL accreditation efforts.
SJAFCA’s Levee Accreditation Efforts
Related Documents
PC AC Meeting_Packet_May 2026
PC Community Workshop
2025.08.15 Paradise Cut Newsletter Summer 2025
2025.07.15 Paradise Cut Bypass Expansion and Multi-Benefit Project FAQS FINAL
2024.12.02 Paradise Cut Advisory Committee Meeting Slides FINAL
2024.10.15 AC Slides Powerpoint
2024.08.23 AC Slides FINAL
Phase 3 Project Decision Recommendations Framework
Phase 3 Project Engagement Strategy
Phase 3 Project Flyer
2024-04-02_Advisory_Committee_Meeting_Slides_FINAL
2024-07-01_Advisory_Committee_Meeting_Slides
2024-07-01_Advisory_Committee_Meeting_Slides
2024.10.15 Paradise Cut Advisory Committee Meeting Agenda Packet FINAL
2024.10.15 Paradise Cut Advisory Committee Meeting Agenda Packet FINAL (Revision)
2024.08.26 Paradise Cut Advisory Committee Meeting Agenda FINAL (2024.08.22)
20240701_PCAC Meeting Agenda
2024 June_ADVISORY COMMITTEE MEETING_CANCELLATION NOTICE
FINAL_AGENDA_Paradise Cut Advisory Committee_2024-04-02
PCEP Fact Sheet - December 2023
Phase 2 Existing Conditions Technical Memorandum
Phase 2 Permitting Strategy Memorandum
Phase 2 Conceptual Design Memorandum
Phase 2 Avoidance, Mitigation, Monitoring, and Maintenance Strategies Technical Memorandum and Addressing Landowner Concerns Strategy Memorandum
Phase 2 Existing and Needed Technical Studies Report
Phase 3 SJAFCA and DWR Funding Agreement
Paradise Cut Memorandum of Understanding Identifying SJAFCA as the Lead Agency and Creating the Advisory Committee